It will adopt secondary-sintered process in the case of raw material with higher moisture content. In the process of drying chamber to the secondary stacking the finished first stacking all will causes the displacement and deformation of broken yards billet , so it will adopt robot stacking machine to achieve second grouping.of yards billet. Xinjiang Ubrban Construction Secondary-sintered system
Sludge、construction waste and insulation block project etc.
Features of production process: rack loading and unloading
Mainly to the high-level products and large block, Xiechuang has developed robot automatic unloading brick and packaging syste, which could achieve unloading bricks in the whole or single layer of stacking.