You are here: Home » 13
It will adopt secondary-sintered process in the case of raw material with higher moisture content. In the process of drying chamber to the secondary stacking
the finished first stacking all will causes the displacement and deformation of broken yards billet , so it will adopt robot stacking machine to achieve second grouping.of yards billet.
Xinjiang Ubrban Construction
Secondary-sintered system
  • Sludge、construction waste and insulation block project etc.
  •  Features of production process: rack loading and unloading

4546
4748


Mainly to the high-level products and large block, Xiechuang has developed robot automatic unloading brick and packaging syste, which could achieve unloading bricks in the whole or single layer of stacking.

111222333
444555666

 
Contact us

Fill in this form or click the service online, all questions will be answered.
Contact us
0086 - 131 5163 0928
sales@brickmachinery.biz
Copyright XieChuang Machinery Co., LTD All rights reserved. Site Map